HV Offshore NordLink

NordLink, The North Sea (Norway-Germany)

Covering a total of 623 kilometers, NordLink is an HVDC (high-voltage direct current) transmission link which will increase energy security in both countries, Norway and Germany.

Key Facts

Client

Statnett, Norway, TenneT, Germany and KfW IPEX-Bank, Germany

Total cable route length

154 km offshore and 54 km onshore

Location of the project

The North Sea (Norway-Germany)

Duration

2015-2021

Quantity of order

Turnkey 525 kV mass impregnated (MI) HVDC cable system for the German sector with a 1,400 MW power rating

Scope

  • HVDC cable system, including 2x154 km submarine DC cable (MI) and 2x54 km underground DC cable (MI)
  • Cable system design and engineering
  • Cable manufacturing and testing
  • Submarine and underground cable-laying and installation
Cale laying in trench for NordLink with construction personell
HV cable laying with construction workers
Cable drum with HV cable and NKT car
NordLink project cable laying barge drone shot from above
High voltage onshore cable installation with excavator
Done shot from NordLink onshore construction site
HV Offshore NordLink
Karlskrona
Offshore high voltage cable production at NKT facility in Karlskrona
Karlskrona

The project

NordLink is Europe’s longest direct power link between the Norwegian and German electricity markets. The commercial operation started in 2021.

Covering a total of 623 kilometers, NordLink is a HVDC (high-voltage direct current) transmission link which will increase energy security in both countries.
The consortium behind NordLink, which includes utilities Statnett and TenneT, has three important reasons for constructing the link. First, it supports the European Union’s target for CO2 emission reduction by allowing greater integration of renewables. The surplus wind power produced in Germany, which must be used as it is produced, can be transmitted to Norway.
Second, at the other end of the link, Norway can export more stable hydropower to help Germany meet the daily power demand. With the hydropower being used as a battery to balance the wind power generation, the link efficiently balances out fluctuations in demand, both daily and seasonal.
Third, the NordLink offers security of supply: interconnecting grids result in higher availability. The link is fundamental to connect Scandinavia with Germany and is designated to help create an integrated European energy market.
Reference Map NordLink

The solution

NKT play a key role in the NordLink project by offering a turnkey cable system solution ensuring reliable power transmission with low electrical losses.

NKT designed, manufactured and installed the 525 kV MI (mass impregnated) cable system in the German sector. It includes 154 km of submarine and 54 km of underground cable route. The system is simplifying the interconnection of the grids and have the capacity to transmit 1,400 MW of renewable energy, which is enough to meet the power needs of about 3.6 million German households.
NKT did not only supply the cable system, produced at the Karlskrona factory running on 100% green electricity, but also ensured top quality and precision when it came to installation. We carried out the installation of the bundled offshore cable with our state-of-the-art cable-laying vessel NKT Victoria. The extensive onshore installation took 1,5 years and required the transportation of 96 cable drums, each with a weight of 67 tons.
The NordLink project was finalized and delivered in early 2021 on time and within the total budget of the customer. It is an excellent example of how HVDC technology can interconnect grids and help countries reach their targets for a renewable energy mix. The smart combination of renewables demonstrates that we can technologically enable a sustainable green energy policy across Europe. It also demonstrates NKT’s commitment to efficient use of renewables; we bring clean power to millions of people and support the energy policies of Germany and Norway. Our cutting-edge technology supports a greener world.
“NordLink is a cornerstone project for an interconnected and green Europe.”
HV Offshore NordLink