Filter and download specific information by keyword.
The Goliat oil and gas field, 105 km off the Northern coast of Norway, was discovered in 2000 and is operated by Eni Norge. The production of oil and gas from a FPSO (floating, production, storage and offloading) platform started in 2016.
Go to pageProviding power cable accessories, cable jointing installation and high voltage testing services for the 33 kV wind farm network.
Go to pageCovering a total of 623 kilometers, NordLink is an HVDC (high-voltage direct current) transmission link which will increase energy security in both countries, Norway and Germany.
Go to pageHolmriis in Ebeltoft has started to use QABLE BOX from NKT in their service vans. This provides for a better overall economy when using cables and wires.
Go to pageBreezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
Go to pageSweden’s second-largest city, Göteborg, needed to strengthen its power grid to replace cables at the end of their lifetime. As part of its upgrade project with NKT at the start of 2020, it upgraded out 94 kilometres of first-generation PEX cables with new NKT cables.
Go to pageNKT contributes to the green transformation of the UK power supply delivering export and array cable systems to Triton Knoll.
Go to pageOur pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Go to page