Using 220 kV submarine and onshore cables cables to connect Glanagow and Raffeen via a busy shipping route - 30.5 km total length
Two substations on each side of the shipping route in the Atlantic had to be reliably connected.
We faced the challenges with a precisely planned, tailor-made cable system and an excellent logistical concept.