The turnkey solution comprised the longest HVAC submarine cable in the world at this time installed in one complete length and at this voltage.
Gjøa was the world’s first floating oil and gas platform to be powered from the onshore grid.
The pioneering 115 kV HVAC cable system is designed, manufactured and installed to withstand the extreme conditions and transmit 40 MW of power for decades to come.