Johan Sverdrup, Norway

With expected resource base of 2.7 billion barrels of oil equivalents, Johan Sverdrup is one of the most important industrial projects in Norway in the next 50 years. Peak production is estimated to be 660,000 barrels of oil per day.

Key Facts

Client

Equinor

Total cable route length

200 km

Location of the project

The North Sea, Norway

Duration

2015-2018

Quantity of order

A turnkey 80 kV cable system with a 100 MW power rating

Scope

The project

One of the largest oil fields on the Norwegian continental shelf is connected to the mainland grid.

Reference Map Johan Sverdrup

The solution

We provided an energy-efficient cable system that contributes to reducing emissions.

“The Johan Sverdrup development is a giant industrial project that needs environmentally sustainable solutions.”